Details: dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed by engg. i/c. within a distance of 60mtr. construction of granular sub base (gsb) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at omc and compacting with viberatory roller to achieve the desired density as per clause 401. providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - all work up to the plinth level in 1:2:4 (1 cement : 2 coarse sand (zone-iii) : 4 graded stone aggregate 200 mm nominal size brick work with common burnt clay (non modular) bricks of class-150 in foundation and plinth in cement mortar 1:4 (1 cement : 4 coarse sand) raising manhole by dismantling & refixing of manhole cover & frame including dimantling c.c. and c.c. work in 1:2:4 but excluding brick work which taken separ
Sector: Municipality