Details: denting and painting of 24/96 saurav and gaurav dragline of bina project charges for denting of lhs wall (450 sq. ft), rhs wall (450 sq. ft) ,operator cabin (200 sq. ft), roof (600 sq.ft) & rear wall (250 sq.ft); area 1950 sq ft for each dragline charges for painting of dragline; area 109180.12 sq ft for each dragline material charges manila rope (2 inch); 250 kg for each dragline manila rope (1.5 inch); 150 kg for each dragline safety belt; 30 nos. for each dragline hiring charges hiring charges of bamboo balli; 75 nos. for 14 days for each dragline patra; 50 nos. for 14 days for each dragline total impact of gst for the purpose of ctc
Sector: Mining