Details: providing, laying, spreading and compacting machine crushed stone ballast of approved quarry of 53~22.4mm size to water bound macadam of g-3 specification including spreading in uniform thickness, hand packing rolling with power roller 8 to 10 tonnes in stages to proper grade and camber applying and brooming with crushable screening material i.e. stone dust to fill-up the interstices of coarse aggregate, watering & rolling making necessary earthen bund to protect edges, lighting, guarding, barricadding etc. including the cost of all materials, labour, t & p etc. required for proper completion of work as per mord specifications no 405. providing & applying tack coat with bitumen vg-10 using bitumen pressure distributor at the rate of 0.30 kg./sqm. on the prepared primed granular/old painted surface, cleaned with air compressor, including all taxes, material, labour, t&p etc required for proper completion of the work, as per mord specification no. 503 (including cost of bitumen) providi
Sector: PWD