Details: prov./applying tack coat with bitumen using at the rate of 0.30 kg per sqm as phalt before b.m & s.d.c layer including etc all comp construction of granular sub base (gsb) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method etc all comp prov./laying bitumious concrete (bc) 25 mm thick ( average) with computrised hmp type hot mix plant hour crushed aggregates of specified gradin permixed with bitumenour binder ( crmb) @ 5.4 per cent of mix and filler etc all comp add 18% gst
Sector: Municipality