Details: dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the engineer-in-charge within a distance of 60 meter (200 feet). dismantling existing plaster including disposal of refuse as directed by the engineer-in-charge within a distance of 60 metre (200 feet). dismentalling of old cc tiles including stacking of old c.c. interlocking tiles. earth work filling including 12km lead concrete with 4 cm. gauge brick ballast fine sand of 1.25 f.m. and cement in proportion are 12:6:1 in foundation and under floors, including supply of all materials, labour. t & p etc. required for proper completion the work. m-150 brick work in 1:4 one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, t & p etc required for proper complition of the work. 12 mm thick plaster 1:4 with cement and four course sand including supply all material and labour, t & etc. providing wall putty on new surface with ap
Sector: Municipality