Details: dismentalling reinforce cement concrete or reinforce brick work including staking of matrial as direct by the ingineer charge within a distance of 60 meter (200 feet) dismentalling of old interlocking tiles with all comp. excavation in foundation in ordinery soil (loam,caly or sand) i/c lift upto 1.5 m and lead upto 30 m and i/c filling watering and ramming of excavated earth under in diposal of malba upto 8 km concrete with 4 cm. gauge brick ballast fine sand of 1.25 f.m. and cement in proportion are 12:6:1 in foundation and under floors, including supply of all materials, labour. t & p etc. required for proper completion the work. m-150 brick work in 1:4 one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, t & p etc required for proper complition of the work 12 mm thick plaster 1:4 with cement and four course sand including supply all material and labour, t & etc. cement concrete with 2.0 cm. gaug;e approve
Sector: Municipality