Details: earth work in cutting or in embankment in ordianry/black cotton soil excavation to be the form of regular pits not exceeding ½ meter (20") in depth and earth work in embankment to be in 20cm (8") layers, including ramming and dressing the surface to required level and slopes and also including 1.5mm (5") lift and 30m (100") lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m (100') distance as directed by the e/i. including royalty @ rs. 30.00/m3 si. no. 253 providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53 mm) obtained from approved query sukrut to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming type 'b' screening materials to fill up the interstices of coarse aggregate, watering and compacting to the required denstity. as per techni
Sector: Agri Marketing