Details: earth work in cutting or in embankment in ordianry/black cotton soil excavation to be the form of regular pits not exceeding ½ meter (20") in depth and earth work in embankment to be in 20cm (8") layers, including ramming and dressing the surface to required level and slopes and also including 1.5mm (5") lift and 30m (100") lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m (100') distance as directed by the e/i. providing laying and compacting stone agregates 45-90 of water bound macadam specification including spreading in uniform thickness hand packing-rolling with3wheeledsteel/vibratory roller80-100 tones instagesto proper grade andcamber applying andbrooming requisite type of screening materials coursesandto fil-lup the interstices ofcourse agreegate watering and compacting tothe required density grading 1 as per technical specification clause405 providing laying and compacting stone agregates 45-63 of water bound macadam spec
Sector: Agri Marketing