Details: earth work in excavation in ordinary soil (loam. clay or sand) including lift uoto 1.50m & lead upto 30m & including filling watering and ramming of eaxacated earth in to the trenches or in to the space between the building and side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by enginner-in-charge. as per s.i.no. 251. cement concrete with 4cm gauge approved stone ballast course sand & cement in proportion of 8:4:1. including supply of all material, labour & t&p etc. as per s.i. no. 281 class-150 brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and t&p etc. required for proper completion of the work. as per s.i. no. 305 class-150 brick work in 1:6 in super structure above plinth level upto floor five level (upto five stories) including necessary cutting and moulding of brick work as required and also including honey combed brick work in thickness of wall more than 12c
Sector: PWD