Details: constrution of gsb granular sub base by providing well graded material spreding in unifrom layers with motor grader on prepared surface complete as per mort & etc all comp. prov./applying tack coat with bitumen using at the rate of 0.30 kg per sqm as phalt before b.ml& s.d.clayer including etc.alll compilete. prov./laying bituimious concrete (bc) 25mm thick (average) with compurbrised hmp type hot mix pllamt producing an average output of 75 tonnes per thour crushed aggregates of specified grading, permixed with bitumenour binder (crmb) 5.4 per cent of imix andi filler transporting the mix with pawer finisher eticall complete work. add 18%gst
Sector: Municipality