Details: part-a workearth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. the earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the engineer-in-charge (but cartage earth work). including all taxes but excluding gst providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405...including all taxes but excluding gst providing and applying tack
Sector: PWD