Details: earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. the earth in form of cutting to be used as spoil banks within 50m distance as directed by the engineer-in-charge.503. excluding gst. providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.excluding gst. providing and applying tack coat with bitumen vg-10 using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prep
Sector: PWD