Details: civil & mechanical work excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the engineer incharge up to a distance of 30 meters from the foundation trenches. 0.00 to 1.50 mtr. 1.50 to 3.00 mtr. 3.00 to 4.50 mtr. 4.50 to 6.00 mtr. providing and laying cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and t&p etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface
Sector: Medical and Health