Description: Construction of New Terminal Building and Other Allied structures Phase I and II at Patna Airport SH Development of Landscape Softscape and Hardscape including maintenance Name of Work Construction of New Terminal Building Other Allied structures Phase I II at Patna Airport SH Development of Landscape Softscape and Hardscape i c maintenance
Details: Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of , lead up to 50 m and lift up to 1.5 m.All kinds of soil Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:All kinds of soil Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density . Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement m
Sector: Airport