Details: part "a" civil work surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of lead up to 50 mtr. and lift up to 1.5 mtr. : all kinds of soil felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches removing the roots and stacking of serviceable material and disposal of unserviceable material. a) beyound 30 cm girth upto including 60 cm girth b) beyound 60 cm girth upto including 120 cm girth earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils filling available excavated earth (excluding r
Sector: Agri Marketing