Details: demolishing cement concrete including disposal of material within 50 meter lead : 1:4:8 or leaner mix. (b/14.2.2) @ 393/- p. demolishing of r.c.c. work including stacking of steel bars and disposal of unserviceab le material within 50 meters lead. (b/14.3) @ 930/- p. dismantling stone rubble masonry including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. in cement mortar (b/14.9.2) @ 641/- p. dismantling tile work in floors and roofs laid in cement mortqr including stacking of serviceable material and disposal of unserviceable material within 50 meter lead : for thickness of tiles 10 mm to 25 mm. (b/14.23.1) @ 20/- p.sqm removing aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling incl. disposal of unserviceable material and stacking of serviceable material with in 50mtr lead as directed by engineer in charge. (b/14.56) @ 17 p.sqm earth work in excavation by mechanical means (hydraulic excavator)/ manual mea
Sector: Power Sector