Details: detail survey as per tentative route:- of the line route, providing of survey pillar at an interval of 3-4 km in the line route with required jungle clearance for survey, profile preparation of approved route on graph sheet and marking of offset on either side of line, marking of side clearance for hills, sand dunes etc, as per specification and tower scheduling. check survey as per approved route of line which includes:-re-checking of the line route as per approved profile, chainage, tower centre marking, bisection of angle tower as required at site. excavation, excluding back filling, including shoring, shuttering, dewatering, etc. upto required depth as per foundation specification drawings :-any soil ,soft rock other than hard rock excavation, excluding back filling, including shoring, shuttering, dewatering, etc. upto required depth as per foundation specification drawings :-hard rock (with blasting subject to permission or without blasting) setting of template & stub/anchor bolt
Sector: Power Sector