Details: (i) const. of remaining work of m/l road kot jewar to ugariyawas p.s. dudu under jaipur (grain) part-a road work construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 50 m as per morth specification clause 305.3 construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mount grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per morth specification clause 401. for grading iii material providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kn static roller in stages to proper grade and camber,
Sector: Agri Marketing