Details: item no. 1 / page no. -4/8pumping out water from ponds or tanks item no. 2 / page no. - 1/2 (a) earth work in excavation in foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) depth of excavation not exceeding 1500 mm.
Sector: Municipality