Details: work schedule for construction of wazu khana at g.f of amber building, wbmdfc. taking out carefully floor & walls tiles from roof stacking seviceable tiles at site and removing as directed within a lead of 75m. stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing within a lead of 75m as directed. single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. brick work with 1st class bricks in cement mortar (1:4)(b) in superstructure, ground floor ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant is codes supplying and laying polythene sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches reinforcement for reinforced concrete work in all sorts of structures
Sector: Social Development