Description: Rate contract for O and M of Air Washery system installed at different locations of power house area for 2 years Name of Work Rate contract for operation and Maintenance of AW system installed at different locations of power house area for 2 years
Details: PART A Maximum possible expenditure for total labour charge for 03 nos Category workers and 02 no No-Category Contractual Workers including O.T charge (maximum 15 hrs/head/month) , dust allowances, ESIC & GPA insurance & all other applicable allowance and benefits as per MOS dtd. 04/10/2021 & considering workers’ wage rate as on 01.01.2023 , excluding profit and overhead for 24 months PART B Charge for 1 no. supervisor andcharge for consumables, tools & tackles, machinery, PPEsexcluding profit for 24 months. PART C Profit on PART A (During billing, profit will be added in the form of percentage (%),which will be finalized before placement of contract) for 24 months
Sector: Generation