Description: Repairing of 02 no 150 HP and 01 no 300 HP mineline make 550 volt star delta starter and 01 no 600 Amps GEC OCB and 02 no 400 Amps 550 volt GEC make OCB switch at Mohanpur OCP under Salanpur Area Name of the Work Contract No
Details: Providing Earth Leakage Providing Contractor Unit Kit (Main & delta) Providing isolator 300 Amps Complete. Providing Thermal overload Relay Providing Current transformer 300/5 Providing Copper Busber Providing push switch Providing Lamp Holder Providing Amps meter 300/5 Providing connection wire Providing 90 sq & 120 sq mm flexible cable Providing Earth Leakage Relay with core balance transformer Moving contact changing PIC clamp Fixed contact changing Separate board for moving Repairing of overload Supply of CT Wiring wires and hardware material Incoming bush insulator Selectors switch changing Fiber main connection Bus bar repairing with reinsulating Nut, bolt, washer, paint etc. Bushing isolator repairing with proper moulding Total Labour Cost for above job (03 Nos starter & 03 Nos switch gear) Add Overhead and supervision charges Provident fund on Labour cost Total impact of GST for the purpose of CTC
Sector: Mining