Details: chapter - i [ supplementary ] excavation, shoring, bamboo piling, fencing & sign board, lighting & signaling and site cleaning etc. 1.14 signallingarrangement at both sides of site to avoid any accident during working period 4 nos. red flags during sunlight at 4 corners and 2 noslight (lamp) in other than sunlight. chapter - i [ supplementary ] excavation, shoring, bamboo piling, fencing & sign board, lighting &signaling and site cleaning etc. 1.8 hire and labour charges for 75 mm dia bamboo railing on jhau/eucalyptusor other approved timber\bamboo posts 1.4 m above g.l and 0.60 m below g.l including tying strongly with coir ropes and boring holes for posts in any soil/ concrete surface/bituminious surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of engineer in charge after removing the barricade.(cost of restoration would be paid seperately
Sector: Municipality