Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, a lead of 75 m. as directed. the item includes spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating same by thorough saturation with water ramming complete. including the cost of supply of sand. (payment to be made on measurement of finished quantity) by fine sand. supplying and laying polythene sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.. hire and labour charges for shuttering with centreing and necessary staging upto 4 m usung approved s
Sector: Municipality