Details: earthwork in excavation from borrow pits (land owned/arranged by the department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments, depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds at top as directed dressing complete. (borrow pit measurement)(i) in ordinary soil(ii) with carried earth arranged by the contractor within a radius of 5 km. construction of sub base using local materials, spreading in uniform layers with motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per clause 401 ofspecifications for road & bridge works of mort&h (5th revision)(iv) for co
Sector: Municipality