Description: Construction of New Mortuary for Haldia SD Hospital under Ward No 05 within Haldia Municipality Name of Work Construction of New Mortuary for Haldia SD Hospital under Ward No 05 within Haldia Municipality The rate are based as per Schedule of rates with latest revision for Building works Volume I including materials labour carriage effective from 1st November 2017 including 14th Corrigenda effective from 08 03 2021
Details: Page No. - 1/2 (a) Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. Page No. - 1/3Earth work in filling in foundation trenches or plinth with good earth. in layers not exceeding 150 mm. including watering and raming etc. layer by layer complete. ( Payment to be made on basis of measurement of fiinished quantity of work ) a) With earth obtained from excav
Sector: Municipality