Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, leveling, and dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm sor pwd (building) page no :- 1 , item no :- 2 (a), earth work in filling in foundation trenches or plinthwith good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layercomplete. (payment to be made on the basis ofmeasurement of finished quantity of work)(a) with earth obtained from excavation of foundation. sor pwd (building) page no :- 1 , item no :- 2 (a), (a) filling in foundation trenches or plinth with silver sa
Sector: Municipality