Details: earthwork in excavation in foundation trenches or drains, in all sorts of soil ( including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the spoils within a lead of 75 m as directed including trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water etc. as required complete.a) depth of excavation not exceeding 1500mm . (b) depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.( payment to be made on the basis of measurement of finished quantity of work )a) with earth obtained from excavation of foundation. (a) filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming compl
Sector: Municipality