Details: building works (b) dismantling, cutting chase, holes etc 10. stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing within a lead of 75m as directed. building works (b) dismantling, cutting chase, holes etc 6. dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing as directed within a lead of 75 m. a) in ground floor including roof. section(b) - sanitary and drainage works.(b)-(ii) soil pipe and fittings.(a) original works.(16.)supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(iii) 150 mm building works ( c ) brickworks, concrete works etc. a. brick works 1. single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and
Sector: Municipality