Details: maintenance and overhauling of v.t. / inclined pumps as per manufacturers instruction manual with all tools, tackles etc. this job includes labour charges, consumables like o - ring, sundry cleaning material etc. this job includes dismantling of all sub assemblies such as gear box, cooling pipes, bearing housing, stuffing box, discharge tee, couplings, shafts, column pipes, bowl assembly, bell mouth, strainer, line shaft enclosing tube etc. reconditioning of all parts, inspection of all parts & replace these parts as per instructions (spares cost excluded) straighthening of shafts & refitting of all parts & sub assemblies with proper alignment including motor removing & refixing, test & trial for 24 hrs etc complete.ii) capacity above 25 cusec and upto 50 cusec pump usor (m&e), part-a, irrigation and waterways dept. page-96 5.2.3 cost of removing and refitting of vt motor of vt pump as per manufacturers manual and refitting it on pump with alignment with all tools tackles, sundry ma
Sector: Municipality