Details: construction of secondary transportation platfrom of garbege at ghoramari, at ward no -13, under pmay within jiaganj-azimganj municipalitysurface dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the within a lead upto 75 m as directed.supplying and laying polythene sheet (150gm/sq.m.) over damp proof course or below flooring or roof terracing or in foundation trenches.ordinary cement concrete (mix 1:3:6) with graded stone chips(20 mm.size) excluding shuttering and reinforcement, if any, in ground floor as per relent i.s code.hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (upto roof of ground floor).(when the height of a particular floor is m
Sector: Municipality