Details: filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating same by through saturation with water ramming complete including the cost of supply of sand. ( payment to be made on measurement of finished quantity ) supply & laying polythene sheet (150gm/sqm) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. ordinery cement concrete ( mix 3 : 1.5 : 1 ) with graded stone chips ( 20 mm. nominal size ) excluding shuttering and reinforcement if any in ground floor. hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard would planks of approved thickness with required bracing for concrete slabs, beams, columns lintels curved or straight including fitting fixing and striking out after completion of works ( upto roof of ground floor ). ( f ) 25 mm to 30 mm shuttering without staging in foundation. earth work in filling
Sector: Municipality