Details: building works (b) dismantling, cutting chase, holes etc 6. dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing as directed within a lead of 75 m. a) in ground floor including roof building works(d) flooring..a. original works..(6)artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. in ground floor. 3 mm. thick topping (high polishing grinding on this itemis not permitted with ordinary cement).using grey cement.(iii) 35 mm. thick.(add extra @1.5% for each addl. floor upto 4th floor and @1.75% for each additional
Sector: Municipality