Details: earth work in excavation of foundation trenches ordrains, in all sorts of soil (including mixed soil butexcluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. the item includes necessary trimming thesides of trenches, levelling, dressing and ramming thebottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. earth work in filling in foundation trenches or plinthwith good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layercomplete. (payment to be made on the basis ofmeasurement of finished quantity of work)(a) with earth obtained from excavation of foundation. weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the engineer-in-charge
Sector: Municipality