Details: disconnection of power and control cable from motor starter panel by providing skilled electrician and keep it in a suitable place without damaging it. de-bolting of top cover and lifting the pump motor unit from sump chamber and placed in a workable position at site and also thorough cleaning of the pump unit to be done. dismantling of the pump motor unit is required to done part by part such as cable gland, motor cover, motor casing, drain out of oil, rotor with shaft etc by using special tool and tackles as per requirement without damaging other spares. thorough inspection, checking with proper tools and tackles and cleaning of the pump motor parts as per direction of eic. removal of the mechanical seal assembly , bearings carefully without damaging other parts by engaging skilled personel . thorough cleaning, drying, de-rusting of the rotor unit with shaft assembly should be done as per direction of eic. heat varnishing of the stator winding is required to be done to provide addi
Sector: Municipality