Details: ofc laying at a normal depth of 1.65 mtr. with all associated works. for bituminised/concrete road/footpath depth=165cms (this standard depth should be obtained in all possible cases as per norms.) horizontal directional drilling(mt) & laying of plb pipe of 33/40 mm dia upto three pipes through boring by "no dig" method using trench-less technology and other associated works along road and under railway/road/canal/streams crossing in all type of soil(including soft rock and hard rock) at suitable depth(at least 200 cms) and entry exit pits depth at least be 165 cms including all civil works.the work inlcudes dit test, i.e. pressure,sponge,air test and all other test associated with dit test.supply of all testing tools and tackling of other required equipments and consumable items,labourers,etc and making all such necessary arrangements are under vendor's scope.the rate includes transportation of materails from departmental store depot to the work site.depth detector and machine gener
Sector: Telecommunication