Details: water bound macadam sub base by consolidating jhama metal of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per clause 404 of specifications for road & bridge works of mort&h (5th revision). bamboo pile walling made of 6.5cm to 7.5cm dia bamboo (in single line) driven about half-length into ground at very close spacing of 30cm c/c side by side, with stout stays at an interval of 90cm fixed with bamboo post of length 1.25m driven 1m below g.l., 3 nos. o
Sector: Road development