Details: (a) filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (page - 2. item no- 4.p.w.d. building works) single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. (page - 14. item no- 1.p.w.d. building works) construction of sub base using local materials, spreading in uniform layers with motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriag
Sector: Municipality