Details: building works (a) earth work,antitermite treatment 2. earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. 44(v) cost of spigot/socket type of pipe with rubber gasket..class np3. bore dia:300mm.thickness:40mm. standard length:2.50m. laying of r.c.c. pipe with spigot ... socket/roll on jointed pipe, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound, filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per d
Sector: Municipality