Description: Carrying out detailed topographic and hydrographic survey of Kharika Khal from Laro to Kharika for a length of 2 65 km Bonai Khal from Manikara to Ghusinga for a length of 1 56 km Dokhali Khal from Manikara to Kharika for a length of 2 12 km Sundarp Name of Work Carrying out detailed topographic and hydrographic survey of Kharika Khal from Laro to Kharika for a length of 2 65 km Bonai Khal from Manikara to Ghusinga for a length of 1 56 km Dokhali Khal from Manikara to Kharika for a length of 2 12 km Sundarpur Khal from Chaulkuri to Sundarpur for a length of 2 65 km at various chainages in Block PS Sabang District Paschim Medinipur under KKB Project Division
Details: Carrying out detailed topographic and hydrographic survey of different canal/khal/ drainage channel / river under KKB Project Division to develop plan and cross section showing the latest river courses, streams, nalas, vegetation and any other water bodies showing other permanent features like bridge, roads, highway, habitation, vegetation etc. up to 50- 100 m either sites of both banks/ stretch from the centre line of the canal/ khal/ drainage/ channel/ river and taking long section, cross section @ 120 m centre to centre using Echo- sounder instrument and D.G.P.S system ( RTK method) and submission of necessary drawings both hard and soft copies complete.
Sector: Irrigation