Details: box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of engineer-in-charge including uprooting and removing plants and jungles when and where necessary. i) depth upto 150 ii) ii) for each additional depth of 150mm and part thereof providing and applying tack coat using cationic bituminous emulsion of approved grade conforming to is : 8887-1978, over prepared surface including cleaning of surface with mechanical broom, moistening the surface, applying tack coat including cost and carriage of emulsion, hire charges of machineries and labour, cost of fuel and lubricants all complete as per specification and direction of the engineer-in-charge.
Sector: Municipality