Details: earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (mode of measurement: pre works and post work building works (b) dismantling, cutting chase, holes etc 6. dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing as directed within a lead of 75 m. a) in ground floor including roof. building works (b) dismantling, cutting chase, holes etc 2. dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing as directed within a lead of 75 m in ground floor including roof. (a) upto 150 mm. thick labour for taking out old soling edging including removing debris.(a) single flat soling labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth. single brick flat soling of picked jhama bricks including ramming and dressi
Sector: Municipality