Details: fine dressing and making the crest to correct camber and gtrade by cutting and filling earth where necessary including extra earth. box cutting in road embankment in all kinds of soil and spreading the soil uniformely over the flanks and considerating and dressing the subgrade to correct camber and grade. brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction.(f) soling or dry pavement with one brick-on-edge laid in herring pattern over a layer of brick flat (thickness 125 mm plus 75 mm) brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one
Sector: Social Development