Details: labour for taking out brick- on -end edging including removing debries to flank or berm, sorting out serviceable materials & stacking labour for taking out brick-on-edge of herring bond including removing debris to flank or berm sorting out serviceable materials and stacking. labour for taking out old soling edging including removing debris (a) single brick flat soaling labour for taking out old soling edging including removing debris (a) double brick flat soaling labour for laying brick edging(75 mm wide) with old or new departmental bricks laid true to line and level including carriage of bricks within a lead of 150 metres cutting necessary trench in soil laying the bricks and repacking the trench on both sides and ramming complete.b) on end edging(250mm)depth brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or hard metalied surface, laying the bricks and repacking the trench (on both si
Sector: Social Development