Details: flank dressing and making the crest to correct camber and gtrade by cutting and filling earth where necessary including extra earth. box cutting in road embankment in all kinds of soil and spreading the soil uniformely over the flanks and considerating and dressing the subgrade to correct camber and grade. brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or in hard metalled surface, laying the bricks and repacking the trench (on both side of the edging) with spoils and ramming the same thoroughly complete as per direction.(b) brick-on-end edging (250 mm) depth. brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction.(e) soling or dry pavement with one brick-on-edge on a lay
Sector: Social Development