Details: labour for taking out brick- on -edge edging including removing debries to flank or berm, sorting out serviceable materials & stacking labour for taking out brick-on-edge of herring bond including removing debris to flank or berm sorting out serviceable materials and stacking. box cutting in road embankment in all kinds of soil and spreading the soil uniformely over the flanks and considerating and dressing the subgrade to correct camber and grade. brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or hard metalied surface, laying the bricks and repacking the trench (on both sides of the edging) with spoils and ramming the same thoroughly complete as per direction. (b)brick-on-end edging (250 mm) depth. labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of
Sector: Social Development