Details: chapter - viii supplying of materials hire charges of machineries 8.29hire charges for engaging air compressor machine with minimum pressure capacity of 5.0 kg/sq.cm arrangement including all necessary equipments and operating staff, carriage, fuel, tools and plants all complete for cutting road / hard crust cutting with pneumatic hammer at desired point in water supply works as per direction of eic . a) with pneumatic hammers for minimum engagement of 8 hrs. in a day earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (mode of measurement: pre works and post works) (ii) in mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) supplying, spreading and compacting sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, bar
Sector: Municipality