Details: laying and jointing pvc pipe. heading labour for taking out brick-on-edge of herring bond including removing debris to flank or berm sorting out serviceable materials and stacking. labour for taking out old soling edging including removing debris(a) single brick flat soling. labour for taking out brick on end edging including removing debries to flank or berm sorting out servicible materials and stacking. labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used).(d) soling or dry pavement with one brick-on-edge laid in herring pattern on a layer of brick flat (thickness 75 mm. plus 125 mm) labour for laying brick edging (75 mm
Sector: Social Development