Details: laying and jointing pvc pipe. heading dismantling all types of plain cement concreteworks, stacking serviceable materials at site andremoving as directed within a lead of 75m. in ground floor including roof (a) upto 150 mm thick removal of ,earth etc. from theworking site and disposal of the same beyond the compound, in conformity with the municipal / corporation rules for such disposal, loading into truck and cleaning the site in all respect as per direction of engineer in charge fine dressing and making the crest to correct camber and grade by cutting and filling earth where necessary including extra earth. box cutting in road embankment in all kinds of soil and spreading the soil uniformely over the flanks and consolidating and dressing the subgrade to correct camber and grade. brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or in hard metalled surface, laying the bricks and repacking the trench (on both s
Sector: Social Development