Details: page no. - 43/40 (ii) reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) for works in foundation and upto roof of ground floor/upto 4 m(i) tor steel/mild steelii. jsw /jspl /shyam / srmb / bmasl / elecrosteel / ssl page no. - 42/36hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fittings, fixing and striking out after completion of works. ( upto roof of ground floor) (when the height of a particular floor is more than 4 m the equivalent floor heigh
Sector: Municipality